The Agency had originally planned to do this in two missions, but Lead Engineer Simon convinced Flight Director Lanalye in a marathon planning session that it could be done in one. Thus, Captain Bob was tasked with piloting the tallest rocket assembled to date into orbit high above Kerbin to service ComSat I, which needed larger-capacity batteries. He then had to lower his orbit to rendezvous with ComSat II, which had experienced problems during launch that caused it to lose all its solar panels. The ComSat Service Vehicle constructed for this mission was an improved model of the craft used for the Kerbin III de-orbit that allowed fuel transfer to restore Center of Mass within the RCS thruster ring for proper translation abilities Bob lacked in the previous mission. The Agency was all set to pull off yet another successful mission.
Jun 23 2014