Tag Archive: Kerbin V(b)

Apr 18 2014

#012: Testing 1…2…

Based on data from the last test flight, engineers think that they have discovered a defect in the way chutes arm prior to re-entry. To test this the second mission will arm the chutes only after entering the lower atmosphere – if they survive.

Read the rest of this entry »