Tag Archive: Kerbin V(c)

Apr 19 2014

#013: Testing 1…2…3…

After repeated failures and with engineer still unable to determine the root cause of the problem the radial chutes have been sent back to the R&D labs and now the focus is on ensuring the nose cone chute can survive re-entry as configured for a kerbed mission. Capt Bill is granted manual remote control of the flight and all goes well until orbit…

Read the rest of this entry »