The second ComSat is sent to Mun to establish a network of relay communications for any orbiting space craft. Originally designed to trail Mun’s orbit around Kerbin, ComSat Mun I failed to hold station in its leading position and now the KSA is constructing the same 3-satellite constellation as their LKO relay network. The new configuration lead to the R&D department coming up with capacitor technology for increased energy storage needed for the ComSats to survive a combined Munar night transit and Kerbol eclipse while operating. A second dish was also added – both improvements would need to be also added to ComSat Mun I at some point in the future. Flight Officer Kirk also performs 2 flights in the Mk1.2 Raker – one to video the launch from 10Km and another to drop science pods on the badlands on the other side of Kerbin.
Tag Archive: Monopropellant
Jul 26 2014
#026: ComSat Mun I & Munar Orbiter I
While various technologies are still under development to eventually put some kerbals on Mun, the Agency is getting ready by establishing a communications relay network that will allow an orbiting craft to maintain a constant connection to Mission Control. To do this, there will be two ComSats placed out in front and behind Mun along its orbit. The first, ComSat Mun I, is what the KSA is launching for this mission. The transfer stage that will carry the satellite into position will then enter into an orbit around Mun for science observations. After this, an impact trajectory will be set up to kick up a good amount of Munar soil that ground-based telescopes can observe. The mission is expected to take two days to complete.
Jun 23 2014
#024: Servicing the ComSat Network
The Agency had originally planned to do this in two missions, but Lead Engineer Simon convinced Flight Director Lanalye in a marathon planning session that it could be done in one. Thus, Captain Bob was tasked with piloting the tallest rocket assembled to date into orbit high above Kerbin to service ComSat I, which needed larger-capacity batteries. He then had to lower his orbit to rendezvous with ComSat II, which had experienced problems during launch that caused it to lose all its solar panels. The ComSat Service Vehicle constructed for this mission was an improved model of the craft used for the Kerbin III de-orbit that allowed fuel transfer to restore Center of Mass within the RCS thruster ring for proper translation abilities Bob lacked in the previous mission. The Agency was all set to pull off yet another successful mission.
Jun 11 2014
#023: Third Time’s the Charm
After failing to rendezvous and de-orbit the derelict Kerbin III spacecraft for a second time, the team at KSA has come up with an even better rendezvous technique they hope will allow for success on this mission. Additionally, the rocket being flown by Capt Bob has been slightly simplified to reduce the chance of any staging malfunctions interrupting the rendezvous attempt.
Jun 03 2014
#022: If At First You Don’t Succeed…
After failing to rendezvous and de-orbit the derelict Kerbin III spacecraft, Capt Bob has launched once again into space to attempt another close-encounter. This mission sets up a less-direct approach to the target to hopefully make things easier, and also tests out a new lift rocket configuration.
May 26 2014
#021: No Rendezvous For You
After the treachery of Capt Bill, Capt Bob gets to finally go into space. His mission is to rendezvous with the Kerbin III spacecraft that was previously stranded in orbit so that he can perform a fuel transfer and de-orbit the defunct vehicle.
May 17 2014
#019: ComSat III Placement
After the previously failed launch, a new ComSat III is sent up into orbit to complete the initial phase of the LKO communications network.
May 10 2014
#018: Friction: 1, KSA: 0
May 08 2014
#017: Check Yo Staging
After the marathon success of getting the first of 3 communications satellites into place above Kerbin, the teams at KSA were hoping for a more routine second mission now that the kinks were deemed “ironed out”. But we forgot something…
May 04 2014
#016: Saving ComSat I
The first of 3 communications satellites is placed to eventually eliminate comm blackouts in Low Kerbin Orbit, however problems arise during orbital insertion that requires a much longer mission than planned.