The first inkling that the KSA was planning an interplanetary mission came back in August of 2014. It took three months of planning and construction of the probe parts (including new solar panels, radar topography scanner, and science instruments) followed by two months of construction and testing for the rocket (including new SRBs, a new orbital engine and an entirely new 2.5m rocket system). The end result was the most advanced craft to date, which was needed to get its payload as far as Duna. Launched during a transfer window, the journey would still take several weeks. This dispatch covers the design, testing, construction, launch and TDI burn that sets the craft on its way towards interplanetary space.